Skip to content

Self Install Guide

Step 1: L/N Wire and Aerial Connection

Follow the diagram.

Step 2: C/T connection

 

1. Firstly open the C/T; 

2. Then,View the bottom-marked current flow of C/T, grid-L wire across C/T from bottom-marked L to N;

3. Last, close the C/T.

 

Grid-L wire across C/T from bottom-marked L to N

Step 3: After Meter is Installed

Make sure your settings are the same as on the diagram

Please Note

By changing your password here does not change your password on the cloud software (xpert.meterbit.com)